PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing shear wall panels at Elev. 5,6 (4th Floor) Facing South-West (800x600).jpg Metal stairs at Stair -5 Facing North-West (800x600).jpg Shear wall panels at Elev. 1,2,3 (3rd Floor) Facing South-West (800x600).jpg Welding beam connections at Derrick -3 (2nd Floor) Facing North Pic -2 (800x600).jpg Working on the Sprinkler Room piping Facing East (800x600).jpg
Previous page Working on the Sprinkler Room piping Facing East (800x600)
Working on the Sprinkler Room piping Facing East (800x600)